Commercial Kitchen And Buffet Installation

Project Description

Client:   Buffet Restaurant
Location:   Connecticut
Year Completed:   2015
Project: Install a buffet and kitchen equipment.

The PKI Group installation team has completed countless installations from residential to commercial all over the world. The average installation takes 4-5 days, and the installers stay on-site until the project has been completed. Consultation with the homeowner, architect, or builder on any questions is all part of the installation process.

The Details

For this particular project we had to create a prototype for a 300 ft. long buffet area. Everything was custom built for this location, including a complete Jade Cooking Suite. The buffet had an integrated hi-tech induction cooker, that keeps food warm without overheating the granite top and included a custom made sneeze guard with chrome accents and LED lighting. The PKI Group was able to complete this job in 57 days, on budget and on time.