Project Description
Location: St. Thomas
Year Completed: 2015
Project: Commercial Kitchen Challenge
Again PKI was presented a challenge we were able to accomplish. We had been recommended due to the complexity of the job at hand. We were requested to lower down the shelf 6″ across 33′ the double self section. The challenge we were presented was we were not to disturb any electrical connections. We were able to cut the shelf, lower down 6″ with out disconnect or damage any electrical! Then bring the shelf down very carefuly and tack weld and polish the unit.
The PKI Group installation team has completed countless installations from residential to commercial all over the world. The average installation takes 4-5 days, and the installers stay on-site until the project has been completed. Consultation with the homeowner, architect, or builder on any questions is all part of the installation process.